4/24/2024 Edit: All Cutting/Digging/Patching is done.
Sunday, 4/28 has been removed as a work day.
We will pour concrete on Saturday the 27th unless it is raining.
The rain date will be the next dry Saturday and will be announced via email.
4/22/2024 Edit: Our cutting/digging/patching is complete. Pour day is expected to be Saturday, April 27th, weather permitting.
Sign up for our annual autocross course repair days, lovingly called Patch Parties.
These events are open to anyone, club member or not.
We will be working at least 2 consecutive weekends.
The schedule and days may change depending on the weather.
4.20 | Sat | 9:00 AM | MAAC Patch Day 1a - Cut, Dig, & Patch |
4.21 | Sun | 9:00 AM | MAAC Patch Day 1b - Cut, Dig, & Patch |
4.27 | Sat | 8:00 AM | MAAC Patch Day 2 - Pouring Day |
5.04 | Sat | 8:00 AM | MAAC Patch Day 3 - Pouring Day (Rain Date) |
5.11 | Sat | 8:00 AM | MAAC Patch Day 4 - Pouring Day (Rain Date) |
Please arrive early enough to start work at the appointed hour.
Ear and eye protection is strongly suggested.
Warm clothing to fend off the winds.
SIR will provide lunch each day.
NOTE: If the work goes quickly, not all of the following days may happen as now scheduled. We will definitely cut, dig, and quick patch at least one day and pour concrete only one day.
1) To have two bonus runs, one must work the Pouring day and more than a day on at least one of the other working weekends.
2) Work more than a day on 4/20 & 4/21 and earn one bonus run.
Work more than a day on 4/27 & 4/28 and earn one bonus run.
Working these four days does not qualify one for two bonus runs as the pouring day must still be worked.
3) Work more than a day on the 20/21, and also on 27/28, and the pouring day to earn two bonus runs and a free event entry.
4) Each workday pays 5 Berry Points. That's a possibility of 25 Berry Points total.
Event requirements
Please have personal protective equipment. Ear plugs, safety glasses, boots, gloves.
Be prepared for cold, windy, wet weather by wearing layers.